Licensed · unlicensed power plant management

Don't just monitor your power plants — make the right economic decision every hour.

ENOPTIMAL brings hourly netting, revenue optimization, live monitoring and theoretical-vs-actual production analysis for solar, wind, hydro, biomass and biogas plants together in a single operations center.

SolarWindHydroBiomassBiogasLicensedUnlicensed

Hourly netting

24/7

Hour-based calculation for solar, wind, hydro and biogas

Plant coverage

7 types

Licensed and unlicensed generation facilities

Revenue optimisation

PTF + limit

The sales limit is shifted to the most profitable hours

Performance analysis

Theoretical/Actual

Losses, alarms and revenue impact together

Live production

Multi-source portfolio

MW · MWh

☀️

Solar

💨

Wind

💧

Hydro

🌿

Biomass

♻️

Biogas

Platform screens

Your field-performance and live-monitoring screens are central to the product story.

The page presents theoretical-versus-actual production and inverter alarms through visual dashboards.

Field Performance Assessment

1,000 kW Solar Plant - Theoretical vs Actual Production

New Simulation
Simulation mode compares loss rate, theoretical production and actual production with demo data.

Theoretical Production

5.77 MWh

Actual Production

4.84 MWh

Performance Ratio

83.95%

Loss Ratio

16.05%

Hourly Production Comparison

TheoreticalActual
06:0008:0010:0012:0014:0016:0018:00

Live Monitoring

Real-time production and status information for all plants

All Plants60s

Total Instant Power

50 kW

/ 2.585 kWp

Today’s Production

286,6 kWh

live meter

Online / Total

1 / 9

2% capacity

Active Alarms

6

attention needed

Power Flow

PV

50 kW

Inverter

DC → AC

Grid

50 kW

Today’s Production Curve

Recent Alarms

View All

Inverter Fault

Inverter-5 Field

14:46

Insulation Fault

Inverter-2 Warehouse Area

13:46

DC Overvoltage

Inverter-1 Main Building

13:16

High Temperature

Inverter-2 Warehouse Area

14:16
Hourly netting engine

The system decides by matching production and consumption within the same hour.

Every hour is read separately: netting, the sales limit and uncompensated energy risk are clearly separated.

1

Aligns data to the same hour

OSOS, EPYS, inverter and meter data are placed on the same timeline. For each hour the system reads production, consumption, energy fed to the grid and drawn amounts together.

2

Calculates netting hour by hour

For every hour it clearly separates whether production covered consumption, which sales limit surplus energy should be booked against, or whether it slipped into the uncompensated zone.

3

Optimises the sales limit

The limit is planned to be used in the most efficient and most profitable hours. The system thus presents you the most optimal solution among scenarios.

4

Shows the result as revenue and risk

Sold energy, netted consumption, avoided loss, uncompensated energy risk and optimised revenue are tracked in one table.

Smart limit and inverter management

The sales limit is planned around the most profitable hours.

The system evaluates the sales limit, hourly consumption, production forecast, PTF impact and field status together. It calculates in which hours using the limit brings more revenue, compares alternative scenarios and recommends inverter actions according to this most optimal plan.

Optimises using the sales limit in the most efficient and most profitable hours.
Reads PTF, the consumption profile and the production forecast together to present the most optimal solution.
Makes uncompensated energy risk and opportunity cost visible as the limit approaches full.
Recommends inverter setpoints to the operations team based on the chosen limit strategy.

Control loop

Production - consumption - PTF - limit

Live
Most profitable sales hour12:00 - 14:00
Sales limit usageoptimised

10:00

Hold

11:00

Prepare

12:00

Use

13:00

Use

14:00

Reduce

15:00

Protect

Recommended solutionthe most optimal plan

Instead of spending the sales limit in low-yield hours, the system reserves it for high-yield hours; if needed, it recommends inverter setpoint control according to this plan.

Field performance

The gap between theoretical and actual production turns into operational action.

Even if the plant appears to have produced well, an inverter or string may be running below expectation. ENOPTIMAL calculates expected production, compares it with actuals and shows where the loss begins.

Inverter-level live tracking

Each inverter's instantaneous power, daily production, connection status and performance deviation are monitored separately. Lost communication or unexpected power drops land on the operations screen.

String-level performance checks

Strings under the same inverter are compared; the likelihood of soiling, shading, fuse failure or panel problems becomes visible early.

Theoretical vs actual production analysis

Expected production is calculated from irradiance, installed capacity, past performance and weather conditions; the gap to actual production is tracked down to its revenue impact.

End-to-end management

Real optimisation starts when production management talks to consumption data.

This page no longer describes just a production chart. The platform gathers solar production matched with consumption subscribers, the hourly netting result, inverter operating decisions and the financial impact in the same management layer.

  • Data: meter, OSOS/EPYS, inverter and string measurements are placed on one timeline.
  • Calculation: hourly production-consumption matching separates netted, sold and uncompensated energy.
  • Control: inverter power management and field alarms are prioritised by economic outcome.
  • Reporting: net revenue, avoided loss, optimised revenue and performance deviation are tracked.
app.enoptimal.com

Production · Consumption · Revenue

Financial summary after hourly netting

Total Production

1.878.856,60kWh

Net Revenue

₺1.260.193,06

Avoided Loss

₺369.373,94

Optimized Revenue

₺1.629.567,00

Monthly Profit/Loss Trend

Revenue, avoided loss and optimized revenue

Guides

Related guides

Expert blog articles on electricity invoices, OSOS, consumption and regulation.

Generation & SolarAugust 28, 2026·13 min

Mistakes that book unlicensed generation as unpaid YEKDEM

The plant runs; the cash stops. Contract power, the load link and the 2× cap can write a month to unpaid YEKDEM. On 1 MW an illustrative 586 thousand TL — the file decides, not this page.

Read
Generation & SolarAugust 25, 2026·14 min

Lisanssız GES’te Uyum Riskleri: Hangi Hatalar Geliri Sıfırlar?

Saatlik mahsuplaşma yürürlükte. Abone grubu uyumsuzluğu, yanlış devir ve veri hatası bedelsiz YEKDEM’e düşürebilir. 2026 uyum rehberi.

Read
Energy ManagementAugust 16, 2026·12 min

PTF spread 2026: noon 300, evening 3,800 — how to read the bill and solar revenue

On 16 Aug 2026 PTF ran 303–3,800 TL/MWh. The monthly average misleads. The same kWh is cheap at noon and expensive at night; solar surplus loses value at midday. Read it with OSOS + PTF.

Read
Production & SolarMay 19, 2026·17 min

Hourly netting 2026: what GES operators must know

Hourly matching of generation and consumption, free-energy risk and sales-limit strategy.

Read
Production & SolarJune 9, 2026·14 min

BESS after hourly netting: C&I GES storage strategy and ROI

Why battery energy storage (BESS) matters after 1 May 2026 hourly netting? PTF spread, 2× limit, peak shaving, regulatory bounds and ROI math.

Read
RegulationAugust 16, 2026·12 min

What is the contracted-capacity excess penalty? 2026 transmission tariffs, regions and calculation

TEİAŞ contracted-capacity excess is a capacity breach. EMRA 14204, 15 tariff regions, Method Notice 4.9/4.14 and the 2× penalty formula — July 2026 worked example.

Read
Production & SolarMay 23, 2026·8 min

10-year distribution fee rules for unlicensed generation (2026)

How the long distribution-fee framework affects unlicensed plant economics.

Read
Energy ManagementMay 25, 2026·14 min

What is energy management: consumption and generation

Unifying OSOS, invoices and alerts so energy decisions stay operational.

Read
Production & SolarJune 9, 2026·12 min

Turkey’s 2026 renewable turning point

Policy and market shifts—hourly netting, storage and portfolio strategy.

Read

See production management live

Request a demo or check pricing and our team will plan a presentation tailored to you.